Buy Tape in Mud™

Liagle

Liagle Liagle Liagle

Liagle

Liagle Liagle Liagle
  • Home
  • Introducing Tape In Mud™️
  • Tapeless Guidelines
  • Test & Testimonials
  • Why drywall joints crack?
  • Tapeless Solutions
  • Official Online Store
  • Distributors & Retailers
  • Contact Liagle
  • Photo Gallery
  • Questions & Answers
  • More
    • Home
    • Introducing Tape In Mud™️
    • Tapeless Guidelines
    • Test & Testimonials
    • Why drywall joints crack?
    • Tapeless Solutions
    • Official Online Store
    • Distributors & Retailers
    • Contact Liagle
    • Photo Gallery
    • Questions & Answers
  • Home
  • Introducing Tape In Mud™️
  • Tapeless Guidelines
  • Test & Testimonials
  • Why drywall joints crack?
  • Tapeless Solutions
  • Official Online Store
  • Distributors & Retailers
  • Contact Liagle
  • Photo Gallery
  • Questions & Answers

Liagle Tapeless Drywall Finishing - Tape In Mud™

Solution A: 2 Coat Finish

Materials: 1 Bag of Tape in Mud™️

1 Bag of High Density Fast Setting Hot Mud Powder

1 Bag of High Density Fast Setting Hot Mud Powder

1 Bag of High Density Fast Setting Hot Mud Powder

1 Bag of High Density Fast Setting Hot Mud Powder

1 Bag of High Density Fast Setting Hot Mud Powder

For how to  use hot mud, Mixing and Application Details 👉

Tapeless Guidelines

First Coat: Tapeless Mudding

Scrap off high spots right after the hot mud sets!!!

  • First Coat: Use 1 bag of high density unsandable fast setting hot mud powder such as Durabond 90, Certainteed High density 90 mix with 1 bag of Tape in Mud™️。
  • Pull the joints really tight and feather the edges nicely and use a sharp putty knife to scrap off any high spots along the joints so No Sanding is needed.
  • There is No Shrinkage, No Cracks. 
  • Prefill, taping, and first coat of mudding done by only one coat of Tapeless Mudding.

Finish drywall joints in Two Coats

  • Second Coat: Coating with regular finishing mud.
  • Just two coats of mudding, the joints should be ready for sanding and painting.
  • Cut working time in half. Two times faster than using Continuous Flow System.

Official Online Store

Solution B: 3 Coats Finish Using Premixed Taping Compound

2 Bags of Tape in Mud™Mix with 1 Box of Premixed taping Compound for First Coat

2 Bags of Tape in Mud™Mix with 1 Box of Premixed taping Compound for First Coat

2 Bags of Tape in Mud™Mix with 1 Box of Premixed taping Compound for First Coat

Use Regular Finishing Compound For the third Coat.

1 Bag of Tape in Mud™mix with 1 Box of Premixed Taping Compound for second Coat

2 Bags of Tape in Mud™Mix with 1 Box of Premixed taping Compound for First Coat

2 Bags of Tape in Mud™Mix with 1 Box of Premixed taping Compound for First Coat

For Mixing and Application Details 👉

Official Online Store

Copyright © 2009 - 2022 Liagle Inc. All Rights Reserved.